|
Notice the perfect fit of the Z-brackets to the Schedule 40 Stainless Posts.
Here is
more info on the Z-Brackets themselves. You might be wondering
about the little set screw in the middle. Click the link and find
out.
These posts have
brackets for 1/2" glass. You can't
exchange the brackets for 3/8 or 1/4" glass. 1/2" is about
10% more than 3/8" (from us.) And 1/2" is perhaps twice
as strong as 3/8". Here's our company photo. We're standing
on 3/8" glass.
We can supply the
glass for you as well as the posts. Either we can have it made at
a tempering plant near you to save on the shipping or we can ship
it to you from a reasonably priced tempering plant. We have favorites
on each coast. Call for pricing on glass. 866-370-0006
Technically speaking,
these posts are not adequate as is for railings on decks with more
than a 30" drop off unless you attach a hand rail. The building
code which came into effect in Jan 08 seems to say that all post
must be 42" and have a hand rail. But it also seems that no
one really knows for sure. Check with your building inspector. 
You can add a hand
rail easily with an HR25PBS.
Other handrail brackets run $160. This one is $59.
You can NOT install
a surface mount flange on top of tile.
We can get custom
made posts with a saddle for a hand rail on top. But, the code seems
to require 42" posts and 32 to 36" high (verify for god's
sake) hand rails so the best solution is the bracket mentioned above.
|